Ram's Road Forecast Now through March 28

Mar 21, 2020 at 02:07 pm by Unknown


(MURFREESBORO) Spring weather is a breath of fresh air for the coming week, but with the downturn of motorists that's expected--Assistant Traffic Director Ram Balachandran notes it may be easier going on the roads now through March 28.

City Construction Projects

Utility Installation Work at E McKnight Dr and N Maple St

Expected Lane Closures: Monday through Friday, 9:00 am to 3:00 pm: Contractor for a private development will be doing utility installation work. There will be partial lane closures and traffic shifts. Appropriate traffic controls will be in place.

Right Turn Lane Improvement Work (Robert Rose Dr at Thompson Ln)

Expected Lane Closures: Monday through Friday, 9:00 am to 3:00 pm: Contractor for the City of Murfreesboro will be making right turn lane improvements on Robert Rose Dr at Thompson Ln. There will be lane closures and traffic interruptions. Appropriate traffic controls will be in place.

Right Turn Lane Improvement Work (Old Fort Pkwy at Gresham Ln)

Expected Lane Closures: Monday through Friday, 9:00 am to 3:00 pm: Contractor for a private development will be performing right turn lane improvements on Old Fort Pkwy at Gresham Ln. There will be lane closures and minor traffic interruptions. Appropriate traffic controls will be in place.

Sewer Repair Work on N Highland Ave between E College St and E Main St

Expected Lane Closures: Monday, 9:00 am to 3:00 pm: Murfreesboro Water Resources Department crews will be making a sewer repair on N Highland Ave. The section of N Highland Ave between E College St and E Main St will be closed to through traffic. Residents will have access at all times. Appropriate traffic controls will be in place.

Drainage Improvement Work on Saint Andrews Dr between Belle Haven Dr and Genoa Dr

Expected Road Closures: Monday through Friday, 7:00 am to 5:00 pm: Murfreesboro Streets Department crews will be doing drainage improvement work on Saint Andrews Dr between Belle Haven Dr and Genoa Dr. Saint Andrews Dr will be closed to through traffic. Residents to and from Belle Haven Dr will have access from Highway 99 and residents to and from Genoa Dr will have access to Veterans Pkwy. Appropriate traffic controls will be in place.

Annual City Street Paving Projects

Expected Lane Closures: Monday through Friday, 9:00 AM - 3:00 PM: City paving contractor will installing HC ramps at the following streets:

  1. Highland Ave at Bell St
  2. Highland Ave at Burton St
  3. Middle Tennessee Blvd at Greenland Dr

Expect lane shifts and traffic interruptions. Appropriate traffic controls will be in place.

TDOT Resurfacing Projects

RUTHERFORD COUNTY, The grading, drainage, construction of bridges, signals and paving on SR 99 from Cason Lane (L.M. 15.97 to I-24 in Murfreesboro (L.M. 18.12)

RUTHERFORD COUNTY, I-24 SMART Corridor

RUTHERFORD COUNTY, The construction of pedestrian facilities on SR 10 Memorial Blvd from DeJarnette Ln to Thompson Ln in Murfreesboro

Source: TDOT

Sections: News