Ram Says "Springtime Work Brings Traffic Delays"

Apr 13, 2013 at 07:27 pm by Unknown


Enjoying those 70 and 80 degree temps, and so are the road crews. City Traffic Engineer Ram Balachandran says the change in season brings increase road work and potential traffic problems. Here are locations to avoid now through April 20th.

City Construction Projects 

Bradyville Pike Road Survey Work (between Broad Street and Rutherford Blvd)

Expected No Lane Closures:  Monday through Friday, 8:00 AM – 4:00 PM:  Surveying crews will be working along Bradyville Pike between Broad Street and Rutherford Blvd.  There will be no lane closures.  Appropriate traffic controls will be in-place.

Murfreesboro Water & Sewer Project (S Baird Lane between E Main Street and E Castle Street)

Expected Lane Closures:  Monday - Friday:  8:30 AM to 2:30 PM:  The contractor for the Water and Sewer Department will be replacing sanitary sewer pipe on S Baird Lane (north to south) between E Main Street and E Castle Street.  S Baird Lane will be closed to through traffic.  Crews will also be replacing a 2” water main along Tyne Ave.  There will be traffic interruptions and lane closures on Tyne Ave.  Driveway access to local residents will be kept open at all times.  Appropriate traffic controlswill be in place.

N Thompson Lane at Sulphur Springs Road Intersection Improvement Project

Expected Lane Closures:  Monday through Friday, 8:30 am to 4:00 pm:  Contractor for City of Murfreesboro will bemaking intersection improvements at N Thompson Lane and Sulphur Springs Road.  The work entails turn lane improvements and signalization work at this location.  There will be minor traffic interruptions and lane closureson Sulphur Springs Road.  Proper traffic controls will be in place.

Medical Center Pkwy (between Gateway Blvd and I-24)

Expected Lane Closures:  Monday through Friday, 9:00 am to 3:00 pm:  Contractor for Murfreesboro Electric Department will be performing electrical maintenance work on Medical Center Pkwy between Gateway Blvd and I-24.  There will be moving lane closures and traffic interruptions on Medical Center Pkwy.  Proper traffic controls will be in place.

S Rutherford Blvd at Chandler Pl Intersection Improvement Project

Expected Lane Closures:  Monday through Friday, 8:30 am to 4:00 pm:  Contractor for a private development across from Chandler Pl will bemaking intersection improvements on S Rutherford Blvd at Chandler Pl.  The work entails turn lane improvement work at this location.  There will be traffic interruptions and lane closureson S Rutherford Blvd.  Proper traffic controls will be in place.

Medical Center Pkwy (between Thompson Lane and I-24)

Expected Lane Closures:  Wednesday & Thursday, 9:00 am to 3:00 pm:  Contractor for City Urban Environmental Department will be mulching on Medical Center Pkwy between Thompson Lane and I-24.  There will be moving lane closures and traffic interruptions on Medical Center Pkwy.  Proper traffic controls will be in place.

Sections: News



Bondware Ads